Micron Final EIS Appendix A–D: Data and Referenced Documents
Scoping Summary, Scoping Comments, Key Documents, Notices and Public Comment Documents (including Comments Received and Responses to Comments) Micron Campus Site Selection Background, Construction Phases, Site Layout Alternatives Revised Construction Schedule and Technical Memo Growth Inducing Effects Land Use, Zoning, and Public Policy
Micron Final EIS Appendix E Vol 1
Geology, Soils, Topography Geology, Soils, and Topography Methodology Soil Type Descriptions Topographical Figures Geotechnical Reports
Geology, Soils, Topography Geotechnical Reports (continued) Micron Blasting Plan
Micron Final EIS Appendix F Vol 1 Part 1
Water Resources Water Resources Study Area Legal and Regulatory Setting Supplemental Information: Affected Environment Supplemental Information: Environmental Consequences Water Resource Figures Jurisdiction Determinations Compensatory Mitigation Plan
Micron Final EIS Appendix F Vol 1 Part 2
Water Resources Micron-Buxton Creek Mitigation Plan
Micron Final EIS Appendix F Vol 2
Water Resources Micron-Fish Creek Mitigation Plan Micron-Upper Caughdenoy Creek Mitigation Plan Micron-Lower Caughdenoy Creek Mitigation Plan
Micron Final EIS Appendix F Vol 3
Water Resources Micron Oneida River Mitigation Plan Micron Sixmile Creek Mitigation Plan Draft SWPPP
Micron Final EIS Appendix G Vol 1
Biological Resources Biological Resources Methodology Legal and Regulatory Setting Supplemental Information: Affected Environment Final Biological Assessment Grassland Breeding Bird Survey
Micron Final EIS Appendix G Vol 2
Biological Resources Youngs Creek Surveys USFWS IPaC System Results NYSDEC EAF Mapper Results Draft Invasive Species Management Plan Preliminary Landscape Drawings
Micron Final EIS Appendices H–J
Historic and Cultural Resources Air Quality Greenhouse Gas Emissions, Climate Change, and Climate Resiliency including CLCPA Analysis
Micron Final EIS Appendix K Vol 1
Solid Waste, Hazardous Waste, and Hazardous Materials Solid Waste, Hazardous Waste, and Hazardous Materials Methodology Solid Waste Transfer Stations and Disposal Facilities Phase I ESA – Main Campus West Phase I ESA – Main Campus East, Childcare, Rai Spure
Micron Final EIS Appendix K Vol 2
Solid Waste, Hazardous Waste, and Hazardous Materials Rail Spur Parcel Addition Supplemental Information: Environmental Consequences Micron Soil Materials Management Plan Micron Construction Waste Management Plan Micron Hazardous Waste Contingency Plan (Outline) OCRRA Waste Capacity Availability 2024 Micron Technology, Inc. Sustainability Report Example Micron Procedures
Micron Final EIS Appendix L
Human Health and Safety Use, Management, and Disposal of Per- and Polyfluoroalkyl Substances at the Micron New York Semiconductor Fabrication Facilities Relevant OSHA Standards Micron Emergency Response Management System Micron Global EHS Construction Performance Standard
Micron Final EIS Appendix M Vol 1
Transportation and Traffic Traffic Impact Study Contents Acronyms and Abbreviations Introduction and Background Methodology and Assumptions Existing Transportation System Crash Analysis Existing Traffic Operations Future Transportation System Year 2027 Traffic Operations Year 2031 Traffic Operations
Micron Final EIS Appendix M Vol 2
Transportation and Traffic Traffic Impact Study Year 2041 Traffic Operations Summary and Recommendations References
Micron Final EIS Appendix M Vol 3
Transportation and Traffic Appendices Appendix A: Data and Referenced Documents
Micron Final EIS Appendix M Vol 4
Transportation and Traffic Appendices Appendix A: Data and Referenced Documents (continued)
Micron Final EIS Appendix M Vol 5
Transportation and Traffic Appendices B. Calibration C. Crash Data D. Model Output
Micron Final EIS Appendices N–R
Noise and Vibration Visual Effects and Community Character Community Facilities, Open Space, and Recreation Socioeconomic Conditions Environmental Justice
Changes from DEIS to FEIS
Micron Final Environmental Impact Statement- redline Appendix (narrative)-redline